Project Name: Alexandria City Public Schools, Minnie Howard Campus
Project Address: 3701 W. Braddock Road, Alexandria VA
Owner/Developer Name: ACPS
General Contractor Name: Gilbane Building Co.
Designer Names:Perkins Eastman

Major Subcontractors:Engineered Construction Products, Southern Insulation,Summit Builders, Freestate Electric, Crystal Steel,Hopke, Strittmatter, Precision Wall Tech

What was special about this team? The site is very tight, and schedule very aggressive. The Gilbane project team collaborated with the sub teams on several occasions to overcome obstacles and issues with re-sequencing the direction of structural framing and the facade. They have stayed on top of OT changes, and payments have been reasonably consistent with the Gilbane team working through the ACPS process. The project is tracking completion for the 2024 school year in spite of all the issues and obstacles.

------------

Project Name: Broad and Washington
Project Address: 
111 E Broad St, Falls Church, VA 22046
Owner/Developer Name: Insight Property Group
General Contractor Name: John Moriarty and Associates
Designer Names: 

Major Subcontractors: Miller & Long, B&M International Steel, RFC, Prospect Waterproofing, Eastern Applicators, Service Glass Industries, Royal Exteriors, Breeden Mechanical Design, Advanced caulking & Waterproofing

What was special about this team?
Broad and Washington is an extremely complicated project logistically. This team coordinated with all of the subcontractors on a tight site to make sure everyone was able to efficiently perform their work. The requestions and change orders were processed and paid promptly. The flow of communication from GC to subcontractors has always excellent and it was a key component in allowing everyone to be successful. For how challenging this project was, the GC and subcontractor team on this project allowed it to run seamlessly.
------------------------------

Project Name: National Air And Space Museum Phase I
Project Address: 600 Independence Avenue , SW Washington DC
Owner/Developer Name: Smithsonian Institution
General Contractor Name: Clark/Smoot DC/ Consigli A Joint Venture
Designer Names: QEA

Major Subcontractors: Ruppert,Kensington, Hardesty, Parkinson, Rugo Stone,Gelberg, Hercules, Component Assembly, Boatman andM. McDean, KDB, Roschmann, Sparkle Paint

What was special about this team?
6000 RFIs, 3500 Submittals, 5000 people worked in the project. More than 200 Trade partners, Vendors, Supplier, Shops… 12000 pcs of stone removed and replaced. Located at National Mall. More importantly Safely lowered, packed and relocated more than 3000 Artifacts. Worked while half of the museum was open to public. Total Collaboration with all parties

------------------------------

Project Name: Parcel I
Project Address: 1300 Yards Place, Washington, DC 2003
Owner/Developer Name: Brookfield Properties
General Contractor Name: HITT Contracting
Designer Names: Perkins Eastman DC, Arrowstreet, SK&A StructuralEngineers
Major Subcontractors: Miller & Long, Joseph Magnolia, Otis Elevator, Brothers

What was special about this team?
Excellent communication between all of the parties, strong coordination efforts between the subcontractors and the fair treatment of the subs all played a role in fostering a great team. The project was organized from both a project management and field operations standpoint. This meant timely payments and fair change order resolution. There was a true sense that the team wanted everyone involved in the project to be successful. The project was also subject to complicated DC compliance standards. Throughout the life of the project, all subcontractors were held accountable for their scope which really made for a smooth finish. HITT did an excellent job of providing supervision on every floor, locking doors where work was complete and monitoring subs going in or out of the project. This project was well-run and allowed even the finish contractors to be successful. Lastly, the project provided opportunities for many CBE and small business entities in the District.

--------------------------------

Project Name: Reston Hospital Surgery Expansion
Project Address: 11645 SANDAL WOOD LN, Manassas, VA
Owner/Developer Name: HCA Healthcare
General Contractor Name: DPR
Designer Names: I. C. Thomasson Associates, Inc. (MEP Designer)

Major Subcontractors: BION, inc., Wayne Insulation, Custom Sheet Metal, Perlectric

What was special about this team?
This project consisted of relocating the hospital pharmacy and engineering departments to make room for four (4) new operating rooms and their associated support spaces. The difficulty was the new ORs would be located adjacent to the Central Mechanical Plant. This meant that a large amount of chilled water piping, steam piping, heating piping, plumbing piping and medical gas piping would have to be relocated while the hospital remained operational. It was determined that a large portion of the ductwork piping would be required to be relocated to the roof above. This change in the project increased our mechanical contract amount by 85%. At the same time, the hospital needed the work complete in 8 weeks. What made this team special: Communication between the owner, GC, involved trades was constant, timely and cooperative. Decisions could be made without holding up production. The change orders were processed quickly and fairly. The GC did their part to facilitate all processes as well as cashflow during the change order approval process with the owner. The hospital staff was just as concerned with the schedule as the contractors and alleviated as many roadblocks as possible. After many long hours and weekends, the work was completed on schedule with minimal disruption to the hospital. Without a great team, this would not have been possible.

----------

Project Name: Sunrise Senior Living - Vienna VA
Owner/Developer Name:Sunrise Senior Living
General Contractor Name: Forrester Construction

Major Subcontractors:  Absolute Builders, Inc.

What was special about this team?
Award winning project. From beginning to end coordination, problem solving, clear expectations, prompt pay.

----------

Project Name: Whitman Walker Clinic
Project Address: 1201 Sycamore Dr SE, Washington, DC 20032
Owner/Developer Name: Redbrick LMD
General Contractor Name: James G. Davis Construction
Designer Names: Winstanley
Major Subcontractors: PCC Construction Components, Precision Wall Tech

What was special about this team?

PCC Construction Components had the pleasure of working on the Whitman Walker Clinic (Max Robinson Center) along with many other industry colleagues. As a Design Assist Project, PCC Construction Components assisted the Architect (Winstanley Architects and Planners), as well as the General Contractor (Davis Construction) in the development of the design with emphasis on performance and aesthetics to help best match the vision Winstanley Architects and Redbrick were aiming to achieve.  PCC Construction Components was responsible for all of the exterior glazing, and metal panels throughout the project. As a team, we all worked through multiple solutions to design issues that arose throughout the project. Through this team process, we were able to complete a monumental Project that is currently being utilized within the community.